03 - CS : Augmentation de la durée de vie secondaire2

Détails du projet

  • XL1100
  • Pebble & Secondary
  • OR
  • Canada

PROBLÈME

Crushers had high vibration, Bowl Shaking, Clamping Cylinder oil leaks, and failed Adjust Drive Gearboxes. OEM recommended to replace the Clamp Ring, Adjustment Ring, and/or Bowl due to excessive thread wear.

SOLUTION

Upon inspecting the Clamp Ring, Adjustment Ring, and Bowl Threads the wear was not excessive and did not require expensive repair or replacement of these large parts. We designed Clamping Cylinders with 58% more stroke to lift the Clamp Ring higher and continue to properly lock the Bowl into static position during operation.

RESULTAT

Vibration, oil leaks, and gearbox failures were eliminated. The Customer was able to run the major castings for several more years and avoid expensive repair and replacement costs.

CONTACTEZ-NOUS

VOULEZ-VOIR TRAVAILLER AVEC NOUS ?

Nom

Archives

Aucune archive à afficher.

Catégories

  • Aucune catégorie
Panier
  • Votre panier est vide Découvrir le magasin
  • fr_FRFrench
    Sélectionnez les champs à afficher. Les autres seront masqués. Faites glisser et déposez pour réorganiser l'ordre.
    • Image
    • UGS
    • Note
    • Prix
    • Stock
    • Disponibilité
    • Ajouter au panier
    • Description
    • Contenu
    • Poids
    • Dimensions
    • Informations supplémentaires
    Cliquez en dehors pour masquer la barre de comparaison
    Comparez