03 - CS Increased Life secondary2

Project Details

  • XL1100
  • Secondary
  • GOLD
  • Canada

PROBLEM

The OEM Main Frame Liner life did not meet the expectations of the mine. This was especially an issue in the Secondary Crushers where larger rock impact caused faster wear than in their Pebble Crushers.

SOLUTION

A new style hanging design was developed to make the Main Frame Liners faster to change. Improved materials were used in the wear zone to place the higher cost, lower wear, materials in efficient locations.

RESULT

Liner life increased by 400% and installation time reduced by 2-4 hours. This was all done in coordination with Mantle and Bowl Liner testing which created opportunity for the customer to test improved designs offered by Optimum Crush.

GET IN TOUCH

WANT TO WORK WITH US?

姓名

档案

没有归档可显示。

类别

  • 没有分类
购物车
  • 您的购物车是空的 浏览商店
  • zh_CNChinese
    选择要显示的字段。其他字段将隐藏。拖放即可重新排列顺序。
    • 图片
    • SKU
    • 评分
    • 价格
    • 库存
    • 可用性
    • 添加到购物车中
    • 描述
    • 内容
    • 体重
    • 尺寸
    • 更多信息
    点击外部区域即可隐藏比较栏
    比较