Détails du projet
- XL1100
- Pebble & Secondary
- OR
- Canada
PROBLÈME
Tramp Release Cylinders were loosening internally. This changed the height of the piston location from one cylinder to the next and caused false clamping force in the system.
SOLUTION
A new internal design was developed to add mechanical locks between the piston and rod.
RESULTAT
The piston held firmly to the rod. Maintenance time was reduced and crusher availability was increased.
CONTACTEZ-NOUS

