Illustrative copper scenario. Values are not independently verified mine economics; enter your site-specific recovered production value per hour.
| Parameter | Modeling assumption |
|---|---|
| Plant throughput | 100,000 metric tonnes/day |
| Hourly throughput | 4,166.7 metric tonnes/hour |
| Copper head grade | 0.40% Cu |
| Metallurgical recovery | 88% |
| Copper price | US$5.00/lb |
| Operating schedule | 24 hours/day |
| Parameter | Modeling assumption |
|---|---|
| Plant throughput | 50,000 metric tonnes/day |
| Hourly throughput | 2,083.3 metric tonnes/hour |
| Gold head grade | 1.00 g/t Au |
| Metallurgical recovery | 86% |
| Gold price | US$4,224/oz |
| Operating schedule | 24 hours/day |
Select to enter your own throughput, grade, recovery and metal price. Hourly gross production value is calculated automatically.
| Parameter | Your assumption |
|---|---|
| Hourly throughput (metric tonnes/hour) | |
Copper: tonnes/hour × grade fraction × recovery fraction × 2,204.62262 lb/metric tonne × US$/lb. Gross contained/recovered metal value, not net revenue.
Scenario assumption (0–5%); not a guaranteed field result.
Share of theoretical extra production the whole plant can actually sell. 100% is an optimistic upper bound; verify the circuit bottleneck.
Non-overlapping planned shutdown hours attributable to main-frame, wear-part and belt work. Must be verified from site maintenance records.
Every mine has a different bottleneck. Switch off anything that does not apply to yours.
Annual production-equivalent opportunity per crusher*
Copper mine example | $161,700/hr x 338.88 realized equivalent hrs (100% realization)
Realized production-equivalent uplift
Bring this estimate to a site visit. Our engineers walk the circuit with your maintenance and operations team, find where your hours are hiding, and build the plan to get them back.
24/7 engineering support: +1 (414) 909-8800
| Lever | How it is figured | Hours per crusher |
|---|---|---|
| Total production-equivalent opportunity |
*Hypothetical example, per crusher. Opportunity value is a hypothetical gross production-value equivalent, not guaranteed incremental revenue or EBITDA; plant bottlenecks, utilization, commodity price, and costs must be verified. Throughput improvement is applied to baseline operating hours only; any interaction with recovered downtime hours is excluded to avoid overstating the modeled opportunity. Hours per lever are illustrative Optimum Crush benchmarks requiring site-specific validation and non-overlap checks, which is why we start with a visit.