Scenario estimates only; benchmark savings and plant constraints require site engineering validation.

Annual operating context

Illustrative copper scenario. Values are not independently verified mine economics; enter your site-specific recovered production value per hour.

Commodity
$/hr
Cone crushers on site
1
10days
12
8hrs
96hrs
+2%

Scenario assumption (0–5%); not a guaranteed field result.

100%

Share of theoretical extra production the whole plant can actually sell. 100% is an optimistic upper bound; verify the circuit bottleneck.

108 hrs

Non-overlapping planned shutdown hours attributable to main-frame, wear-part and belt work. Must be verified from site maintenance records.

365 days8,760 total hours
Planned shutdown240 hrs
Liner changes80 hrs
Unplanned downtime96 hrs
Baseline operating time8,344 hrs

Where the hours come from

Every mine has a different bottleneck. Switch off anything that does not apply to yours.

CRUUZ 1100 cone crusher

Annual uptime & production timeline

DowntimeRecovered time

Downtime hours saved plus throughput-equivalent production hours per crusher per year 339 EQUIVALENT HOURS
Downtime saved 172 Production equivalent 167
339HRS

Annual production-equivalent opportunity per crusher*

$54.8M
Gross opportunity
value

Copper mine example | $161,700/hr x 338.88 realized equivalent hrs (100% realization)

4.1%

Realized production-equivalent uplift

Let's check these numbers against your crusher.

Bring this estimate to a site visit. Our engineers walk the circuit with your maintenance and operations team, find where your hours are hiding, and build the plan to get them back.

24/7 engineering support: +1 (414) 909-8800

Book a Site Visit

See the math
LeverHow it is figuredHours per crusher
Total production-equivalent opportunity

*Hypothetical example, per crusher. Opportunity value is a hypothetical gross production-value equivalent, not guaranteed incremental revenue or EBITDA; plant bottlenecks, utilization, commodity price, and costs must be verified. Throughput improvement is applied to baseline operating hours only; any interaction with recovered downtime hours is excluded to avoid overstating the modeled opportunity. Hours per lever are illustrative Optimum Crush benchmarks requiring site-specific validation and non-overlap checks, which is why we start with a visit.