{"id":27545,"date":"2026-06-05T17:45:56","date_gmt":"2026-06-05T17:45:56","guid":{"rendered":"https:\/\/optimumcrush.com\/?p=27545"},"modified":"2026-06-03T17:54:09","modified_gmt":"2026-06-03T17:54:09","slug":"crusher-uptime-improvement","status":"publish","type":"post","link":"https:\/\/optimumcrush.com\/es\/crusher-uptime-improvement\/","title":{"rendered":"How Parts Availability Drives Crusher Uptime Improvement at Large Mining Operations"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">Every crusher uptime target at a large mining operation has an implicit <\/span><a href=\"https:\/\/optimumcrush.com\/service\/cone-crusher-parts\/\"><span style=\"font-weight: 400;\">parts availability <\/span><\/a><span style=\"font-weight: 400;\">assumption built into it. Most operations have never made that assumption explicit, which is why parts-related downtime extensions keep appearing in the actual results while disappearing from the uptime improvement plan.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Crusher uptime improvement requires understanding and managing every variable that determines how long the crusher is available and performing within its target range. Parts availability is one of those variables, and for most large operations it&#8217;s the one with the most room for improvement relative to the investment required to close the gap. Connecting parts decisions explicitly to uptime targets is the first step toward a parts strategy that&#8217;s designed around operational outcomes rather than procurement convenience.<\/span><\/p>\n<h2><span style=\"font-weight: 400;\">Why Parts Availability Is a Core Uptime Variable, Not a Procurement Afterthought<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Uptime is determined by two things: how often the crusher stops unplanned, and how long it stays stopped when it does. Most uptime improvement efforts focus heavily on the first variable through predictive maintenance, better monitoring, and improved operating practices. The second variable, how long the crusher stays stopped, gets significantly less structured attention despite being equally important to the uptime outcome.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Parts availability is the primary driver of how long an unplanned stop extends beyond the time required to diagnose and physically execute the repair. When the right mining crusher parts are immediately available, the stop duration is bounded by diagnosis time plus repair time. When the right parts aren&#8217;t available, the stop duration adds parts procurement time, which at large operations managing complex supply chains can range from hours to days depending on the component and the site&#8217;s logistics situation.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">At operations where downtime cost is significant, that procurement extension is the most expensive component of many unplanned events. It&#8217;s also the most controllable, because unlike the failure itself, the parts availability gap that extends it is a predictable and manageable risk rather than an unpredictable one. Treating parts availability as a core uptime variable rather than a procurement function changes both how it&#8217;s managed and how much impact that management has on actual uptime outcomes.<\/span><\/p>\n<h2><span style=\"font-weight: 400;\">The Chain From Parts Decisions to Uptime Outcomes<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">The connection between parts decisions and uptime outcomes runs through a chain of intermediate variables, and understanding that chain is what makes it possible to design a parts strategy around uptime targets rather than around procurement convenience.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The chain starts with the parts decision: which components are stocked on site, which are stocked at the supplier, which are ordered on demand, and what the committed delivery time is for each category. Those decisions determine the parts availability profile for each component type in the circuit.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The parts availability profile determines the maximum downtime extension for each component type if it&#8217;s needed and not immediately available. A component that&#8217;s stocked on site has a zero-hour extension. A component that&#8217;s stocked at the supplier with a four-hour committed delivery time has a four-hour maximum extension. A component that&#8217;s ordered on demand with a two-week lead time has a potential two-week extension.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The maximum downtime extension for each component type, weighted by the probability that the component will be needed in an unplanned event, determines the expected parts-related downtime contribution to the overall uptime figure. That expected contribution is what the parts strategy should be designed to minimize relative to the cost of doing so.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">When that chain is made explicit, the parts strategy becomes a design problem with a clear objective: minimize expected parts-related downtime contribution at an acceptable cost, which is a more tractable and more operationally meaningful problem than &#8220;stock the right parts.&#8221;<\/span><\/p>\n<h2><span style=\"font-weight: 400;\">The Mining Crusher Parts Decisions That Have the Highest Uptime Impact<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Not all parts decisions have equal uptime impact, and concentrating planning attention on the decisions with the highest impact is what makes a parts-driven uptime improvement strategy efficient rather than exhaustive.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Liner change timing and staging have the highest uptime impact of any routine parts decision at most cone crusher operations. Liner changes are the most frequent planned maintenance events, and each one represents a downtime window that can either be executed efficiently with all required components staged and ready or extended by missing components discovered mid-change. Optimizing liner change staging, including the liner itself and all components likely to be needed during the change window, eliminates a significant category of avoidable downtime extension.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Critical hydraulic component availability has the highest uptime impact of any unplanned event category at most operations. Hydraulic system faults are among the most common causes of unplanned cone crusher stops, and the components involved span a wide range of sizes and lead times. Stocking the highest-consequence hydraulic components on site, with verified supplier backup for the remainder, directly reduces the average duration of hydraulic-related downtime events.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Wear component availability beyond liners, including the broader range of crusher wear parts that have predictable consumption rates, affects uptime through a different mechanism. These components rarely cause sudden stops, but their unavailability when they reach end of life can force a change to be deferred beyond the optimal timing, which affects performance rather than availability. Planning these components on the same rolling horizon as liners keeps the wear parts strategy aligned with the uptime objective rather than just the parts procurement objective.<\/span><\/p>\n<h2><span style=\"font-weight: 400;\">How to Quantify the Uptime Value of Better Parts Availability<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Quantifying the uptime value of a parts availability improvement requires three inputs: the current frequency of parts-related downtime extensions, the average duration of those extensions, and the cost of downtime per hour at the specific operation.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The current frequency and duration of parts-related extensions is typically available from maintenance records if downtime events are logged with root cause classification. If parts unavailability isn&#8217;t currently captured as a separate downtime cause category, adding that classification to the logging system is a near-term priority for any operation trying to quantify this opportunity.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">With that data, the expected annual hours of parts-related downtime extension can be calculated. Multiplying that figure by the downtime cost per hour gives the annual production value currently being lost to parts availability gaps. That number, compared against the carrying cost of an improved on-site inventory and the relationship cost of a verified supplier stock commitment, defines the ROI of the parts availability improvement.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">At most large mining operations where this calculation has been done explicitly, the ROI of closing the parts availability gap is compelling. The carrying cost of the additional on-site inventory required is typically a small fraction of the production value lost annually to parts-related downtime extensions. The investment case isn&#8217;t close. It&#8217;s one of the clearest financial decisions in the maintenance planning domain.<\/span><\/p>\n<h2><span style=\"font-weight: 400;\">Why Uptime Targets and Parts Strategy Need to Be Set Together<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Here&#8217;s the planning disconnect that keeps parts-related downtime extensions appearing in actual results while disappearing from uptime improvement plans: uptime targets are typically set by operations management based on production requirements, and parts strategy is typically managed by procurement based on cost and supplier relationships. Those two processes rarely interact directly, which means the parts strategy is never explicitly designed to support the uptime target.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The result is a gap between what the uptime target assumes about parts availability and what the parts strategy actually provides. The uptime target assumes that when a component fails and needs replacement, the replacement will be available within a timeframe that doesn&#8217;t materially extend the downtime event. The parts strategy provides whatever availability the procurement process has historically produced, which may or may not match that assumption.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Making that assumption explicit, and then designing the parts strategy to fulfill it, is the planning integration that closes the gap. It requires operations management to specify the maximum acceptable parts-related downtime extension for each component category, and procurement to verify that the current parts availability profile meets those specifications and to close the gaps where it doesn&#8217;t.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">That integration doesn&#8217;t require a new system or a significant process change. It requires a conversation between operations and procurement that most organizations haven&#8217;t had in explicit terms about mining crusher parts and uptime outcomes, and a shared commitment to aligning the parts strategy with the operational objective it&#8217;s supposed to support.<\/span><\/p>\n<h2><span style=\"font-weight: 400;\">Building a Parts-Driven Uptime Improvement Plan<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">A parts-driven crusher uptime improvement plan has four components that work together to move from the current parts availability profile to one that supports the uptime target.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The first component is a current state assessment: documenting the existing on-site inventory composition, the supplier stock and delivery commitments for non-stocked components, and the historical frequency and duration of parts-related downtime extensions. That assessment establishes the baseline against which improvement is measured.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The second component is a gap analysis: comparing the current parts availability profile against the availability required to support the uptime target, component by component. The gaps that emerge from that comparison are the investment priorities for the improvement plan.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The third component is a parts availability improvement roadmap: prioritized actions to close the identified gaps, including on-site inventory additions, supplier relationship improvements, and emergency logistics pre-arrangements, sequenced by the uptime impact of each action relative to its cost and implementation complexity.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The fourth component is a measurement framework: defining how parts-related downtime will be tracked going forward, what targets will be set for parts availability performance, and how frequently the parts strategy will be reviewed against actual uptime outcomes to ensure the two remain aligned as operating conditions change.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Crusher uptime improvement that&#8217;s designed around parts availability as a core variable rather than a procurement afterthought delivers results that uptime improvement plans built around maintenance practices alone consistently miss. If your operation&#8217;s uptime targets and parts strategy haven&#8217;t been explicitly connected, <\/span><a href=\"https:\/\/optimumcrush.com\/\"><span style=\"font-weight: 400;\">Optimum Crush<\/span><\/a><span style=\"font-weight: 400;\"> can help you build that connection and close the gaps it reveals. <\/span><a href=\"https:\/\/optimumcrush.com\/contact-us\/\"><span style=\"font-weight: 400;\">Reach out <\/span><\/a><span style=\"font-weight: 400;\">and let&#8217;s look at what a parts-driven uptime improvement plan would mean for your crushing circuit.<\/span><\/p>\n<p><!--a=1--><\/p>","protected":false},"excerpt":{"rendered":"<p>Every crusher uptime target at a large mining operation has an implicit parts availability assumption built into it. Most operations have never made that assumption explicit, which is why parts-related downtime extensions keep appearing in the actual results while disappearing from the uptime improvement plan. Crusher uptime improvement requires understanding and managing every variable that [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":27546,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[56],"tags":[],"class_list":["post-27545","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-maintenance-best-practices-training"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Better Parts Availability Drives Crusher Uptime<\/title>\n<meta name=\"description\" content=\"Parts availability &amp; crusher uptime improvement go hand in hand. See how stocked inventory &amp; fast delivery keep mining operations running.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/optimumcrush.com\/es\/crusher-uptime-improvement\/\" \/>\n<meta property=\"og:locale\" content=\"es_MX\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Better Parts Availability Drives Crusher Uptime\" \/>\n<meta property=\"og:description\" content=\"Parts availability &amp; crusher uptime improvement go hand in hand. See how stocked inventory &amp; fast delivery keep mining operations running.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/optimumcrush.com\/es\/crusher-uptime-improvement\/\" \/>\n<meta property=\"og:site_name\" content=\"Optimum Crush\" \/>\n<meta property=\"article:published_time\" content=\"2026-06-05T17:45:56+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/optimumcrush.com\/wp-content\/uploads\/2026\/06\/ChatGPT-Image-Jun-3-2026-12_52_32-PM.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1774\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"NP Content\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"NP Content\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/optimumcrush.com\\\/crusher-uptime-improvement\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/optimumcrush.com\\\/crusher-uptime-improvement\\\/\"},\"author\":{\"name\":\"NP Content\",\"@id\":\"https:\\\/\\\/optimumcrush.com\\\/es\\\/#\\\/schema\\\/person\\\/b1c19ecfd7262b4b905979da4af543cb\"},\"headline\":\"How Parts Availability Drives Crusher Uptime Improvement at Large Mining Operations\",\"datePublished\":\"2026-06-05T17:45:56+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/optimumcrush.com\\\/crusher-uptime-improvement\\\/\"},\"wordCount\":1674,\"publisher\":{\"@id\":\"https:\\\/\\\/optimumcrush.com\\\/es\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/optimumcrush.com\\\/crusher-uptime-improvement\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/optimumcrush.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/ChatGPT-Image-Jun-3-2026-12_52_32-PM.webp\",\"articleSection\":[\"Maintenance Best Practices &amp; Training\"],\"inLanguage\":\"es\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/optimumcrush.com\\\/crusher-uptime-improvement\\\/\",\"url\":\"https:\\\/\\\/optimumcrush.com\\\/crusher-uptime-improvement\\\/\",\"name\":\"Better Parts Availability Drives Crusher Uptime\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/optimumcrush.com\\\/es\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/optimumcrush.com\\\/crusher-uptime-improvement\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/optimumcrush.com\\\/crusher-uptime-improvement\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/optimumcrush.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/ChatGPT-Image-Jun-3-2026-12_52_32-PM.webp\",\"datePublished\":\"2026-06-05T17:45:56+00:00\",\"description\":\"Parts availability & crusher uptime improvement go hand in hand. See how stocked inventory & fast delivery keep mining operations running.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/optimumcrush.com\\\/crusher-uptime-improvement\\\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/optimumcrush.com\\\/crusher-uptime-improvement\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/optimumcrush.com\\\/crusher-uptime-improvement\\\/#primaryimage\",\"url\":\"https:\\\/\\\/optimumcrush.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/ChatGPT-Image-Jun-3-2026-12_52_32-PM.webp\",\"contentUrl\":\"https:\\\/\\\/optimumcrush.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/ChatGPT-Image-Jun-3-2026-12_52_32-PM.webp\",\"width\":1774,\"height\":887,\"caption\":\"cone crusher operating at full production capacity at a mining operation illustrating the connection between parts availability and crusher uptime improvement\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/optimumcrush.com\\\/crusher-uptime-improvement\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/optimumcrush.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How Parts Availability Drives Crusher Uptime Improvement at Large Mining Operations\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/optimumcrush.com\\\/es\\\/#website\",\"url\":\"https:\\\/\\\/optimumcrush.com\\\/es\\\/\",\"name\":\"Optimum Crush\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/optimumcrush.com\\\/es\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/optimumcrush.com\\\/es\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/optimumcrush.com\\\/es\\\/#organization\",\"name\":\"Optimum Crush\",\"url\":\"https:\\\/\\\/optimumcrush.com\\\/es\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/optimumcrush.com\\\/es\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/optimumcrush.com\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/OC-Website-Header.webp\",\"contentUrl\":\"https:\\\/\\\/optimumcrush.com\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/OC-Website-Header.webp\",\"width\":1559,\"height\":770,\"caption\":\"Optimum Crush\"},\"image\":{\"@id\":\"https:\\\/\\\/optimumcrush.com\\\/es\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/optimumcrush.com\\\/es\\\/#\\\/schema\\\/person\\\/b1c19ecfd7262b4b905979da4af543cb\",\"name\":\"NP Content\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d56c977dacb0b5f26380cda02baed4a5abaedf9ef757380a1b1f1b70aacc023f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d56c977dacb0b5f26380cda02baed4a5abaedf9ef757380a1b1f1b70aacc023f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d56c977dacb0b5f26380cda02baed4a5abaedf9ef757380a1b1f1b70aacc023f?s=96&d=mm&r=g\",\"caption\":\"NP Content\"},\"url\":\"https:\\\/\\\/optimumcrush.com\\\/es\\\/author\\\/np-content\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Better Parts Availability Drives Crusher Uptime","description":"Parts availability & crusher uptime improvement go hand in hand. See how stocked inventory & fast delivery keep mining operations running.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/optimumcrush.com\/es\/crusher-uptime-improvement\/","og_locale":"es_MX","og_type":"article","og_title":"Better Parts Availability Drives Crusher Uptime","og_description":"Parts availability & crusher uptime improvement go hand in hand. See how stocked inventory & fast delivery keep mining operations running.","og_url":"https:\/\/optimumcrush.com\/es\/crusher-uptime-improvement\/","og_site_name":"Optimum Crush","article_published_time":"2026-06-05T17:45:56+00:00","og_image":[{"width":1774,"height":887,"url":"https:\/\/optimumcrush.com\/wp-content\/uploads\/2026\/06\/ChatGPT-Image-Jun-3-2026-12_52_32-PM.webp","type":"image\/webp"}],"author":"NP Content","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"NP Content","Tiempo de lectura":"8 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/optimumcrush.com\/crusher-uptime-improvement\/#article","isPartOf":{"@id":"https:\/\/optimumcrush.com\/crusher-uptime-improvement\/"},"author":{"name":"NP Content","@id":"https:\/\/optimumcrush.com\/es\/#\/schema\/person\/b1c19ecfd7262b4b905979da4af543cb"},"headline":"How Parts Availability Drives Crusher Uptime Improvement at Large Mining Operations","datePublished":"2026-06-05T17:45:56+00:00","mainEntityOfPage":{"@id":"https:\/\/optimumcrush.com\/crusher-uptime-improvement\/"},"wordCount":1674,"publisher":{"@id":"https:\/\/optimumcrush.com\/es\/#organization"},"image":{"@id":"https:\/\/optimumcrush.com\/crusher-uptime-improvement\/#primaryimage"},"thumbnailUrl":"https:\/\/optimumcrush.com\/wp-content\/uploads\/2026\/06\/ChatGPT-Image-Jun-3-2026-12_52_32-PM.webp","articleSection":["Maintenance Best Practices &amp; Training"],"inLanguage":"es"},{"@type":"WebPage","@id":"https:\/\/optimumcrush.com\/crusher-uptime-improvement\/","url":"https:\/\/optimumcrush.com\/crusher-uptime-improvement\/","name":"Better Parts Availability Drives Crusher Uptime","isPartOf":{"@id":"https:\/\/optimumcrush.com\/es\/#website"},"primaryImageOfPage":{"@id":"https:\/\/optimumcrush.com\/crusher-uptime-improvement\/#primaryimage"},"image":{"@id":"https:\/\/optimumcrush.com\/crusher-uptime-improvement\/#primaryimage"},"thumbnailUrl":"https:\/\/optimumcrush.com\/wp-content\/uploads\/2026\/06\/ChatGPT-Image-Jun-3-2026-12_52_32-PM.webp","datePublished":"2026-06-05T17:45:56+00:00","description":"Parts availability & crusher uptime improvement go hand in hand. See how stocked inventory & fast delivery keep mining operations running.","breadcrumb":{"@id":"https:\/\/optimumcrush.com\/crusher-uptime-improvement\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/optimumcrush.com\/crusher-uptime-improvement\/"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/optimumcrush.com\/crusher-uptime-improvement\/#primaryimage","url":"https:\/\/optimumcrush.com\/wp-content\/uploads\/2026\/06\/ChatGPT-Image-Jun-3-2026-12_52_32-PM.webp","contentUrl":"https:\/\/optimumcrush.com\/wp-content\/uploads\/2026\/06\/ChatGPT-Image-Jun-3-2026-12_52_32-PM.webp","width":1774,"height":887,"caption":"cone crusher operating at full production capacity at a mining operation illustrating the connection between parts availability and crusher uptime improvement"},{"@type":"BreadcrumbList","@id":"https:\/\/optimumcrush.com\/crusher-uptime-improvement\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/optimumcrush.com\/"},{"@type":"ListItem","position":2,"name":"How Parts Availability Drives Crusher Uptime Improvement at Large Mining Operations"}]},{"@type":"WebSite","@id":"https:\/\/optimumcrush.com\/es\/#website","url":"https:\/\/optimumcrush.com\/es\/","name":"Optimum Crush","description":"","publisher":{"@id":"https:\/\/optimumcrush.com\/es\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/optimumcrush.com\/es\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Organization","@id":"https:\/\/optimumcrush.com\/es\/#organization","name":"Optimum Crush","url":"https:\/\/optimumcrush.com\/es\/","logo":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/optimumcrush.com\/es\/#\/schema\/logo\/image\/","url":"https:\/\/optimumcrush.com\/wp-content\/uploads\/2021\/11\/OC-Website-Header.webp","contentUrl":"https:\/\/optimumcrush.com\/wp-content\/uploads\/2021\/11\/OC-Website-Header.webp","width":1559,"height":770,"caption":"Optimum Crush"},"image":{"@id":"https:\/\/optimumcrush.com\/es\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/optimumcrush.com\/es\/#\/schema\/person\/b1c19ecfd7262b4b905979da4af543cb","name":"NP Content","image":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/secure.gravatar.com\/avatar\/d56c977dacb0b5f26380cda02baed4a5abaedf9ef757380a1b1f1b70aacc023f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d56c977dacb0b5f26380cda02baed4a5abaedf9ef757380a1b1f1b70aacc023f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d56c977dacb0b5f26380cda02baed4a5abaedf9ef757380a1b1f1b70aacc023f?s=96&d=mm&r=g","caption":"NP Content"},"url":"https:\/\/optimumcrush.com\/es\/author\/np-content\/"}]}},"_links":{"self":[{"href":"https:\/\/optimumcrush.com\/es\/wp-json\/wp\/v2\/posts\/27545","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/optimumcrush.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/optimumcrush.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/optimumcrush.com\/es\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/optimumcrush.com\/es\/wp-json\/wp\/v2\/comments?post=27545"}],"version-history":[{"count":1,"href":"https:\/\/optimumcrush.com\/es\/wp-json\/wp\/v2\/posts\/27545\/revisions"}],"predecessor-version":[{"id":27547,"href":"https:\/\/optimumcrush.com\/es\/wp-json\/wp\/v2\/posts\/27545\/revisions\/27547"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/optimumcrush.com\/es\/wp-json\/wp\/v2\/media\/27546"}],"wp:attachment":[{"href":"https:\/\/optimumcrush.com\/es\/wp-json\/wp\/v2\/media?parent=27545"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/optimumcrush.com\/es\/wp-json\/wp\/v2\/categories?post=27545"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/optimumcrush.com\/es\/wp-json\/wp\/v2\/tags?post=27545"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}